Buffalo-10 Well, Carnarvon Petroleum
Technical Studies
Australia
Buffalo-10 Well, Carnarvon Petroleum
The Buffalo Oilfield was discovered by BHP in 1996, with first oil in 1999 and production ceased in 2004 after 20.5 MMstb produced. The field is located in the Buffalo PSC.
GET IN TOUCH
Project:
Carnarvon farmed in with Advance Energy to re-develop the field based on new full wave inversion technology (FWI) over existing 3D seismic.
Outcome:
Sproule ERCE undertook shallow geohazards and pore pressure prediction (PPP) studies to aid in the planning and execution of Buffalo-10.
Benefit
Sproule ERCE has extensive experience in fault and fracture analysis, risk evaluation and borehole planning and image log interpretation.
For each formation interval, Sproule ERCE identified hazards and provided a detailed formation description which allows the client to make informed decision while minimizing the risk.
For each formation interval, Sproule ERCE identified hazards and provided a detailed formation description which allows the client to make informed decision while minimizing the risk.